Flight schedules logic ?
-
I dont understand the logic behind the flight schedule. I tried to change the days for all the monday flights departing LOWS. In my comprehension by indicating these flights were active on days 1234567, these should also appear in the schedule of avery other day of the week right ?
But that's not the case as you can see in the following pics where I changed the monday flights and they dont appear in tuesday schedule (or any other day)
-
I dont understand the logic behind the flight schedule. I tried to change the days for all the monday flights departing LOWS. In my comprehension by indicating these flights were active on days 1234567, these should also appear in the schedule of avery other day of the week right ?
But that's not the case as you can see in the following pics where I changed the monday flights and they dont appear in tuesday schedule (or any other day)
@elpix did you change the schedule by double clicking and typing directly in the box on Monday or by hitting the 'Create New Schedule' button?
-
@elpix did you change the schedule by double clicking and typing directly in the box on Monday or by hitting the 'Create New Schedule' button?
@killamarshian by clicking and editing the field then clicking SAVE CHANGES afterward. I closed the traffic control centre and reopened it and my changes are still there. but the logic doesnt work. In fact it does not work for the existing entries either so I dont understand the purpose of this value.
-
@killamarshian by clicking and editing the field then clicking SAVE CHANGES afterward. I closed the traffic control centre and reopened it and my changes are still there. but the logic doesnt work. In fact it does not work for the existing entries either so I dont understand the purpose of this value.
@elpix I just tried that also and had the same result,
I modified the days fields all to 1234567 and pressed save changes,. I then looked at the other 6 days and they did not change -
@elpix I just tried that also and had the same result,
I modified the days fields all to 1234567 and pressed save changes,. I then looked at the other 6 days and they did not change@hunterdouglas I thought by using the 'Create New Schedule’ option it would force the program to run the logic.
-
I dont understand the logic behind the flight schedule. I tried to change the days for all the monday flights departing LOWS. In my comprehension by indicating these flights were active on days 1234567, these should also appear in the schedule of avery other day of the week right ?
But that's not the case as you can see in the following pics where I changed the monday flights and they dont appear in tuesday schedule (or any other day)
@elpix It is how I thought. To modify the days as you require you need to create a clone of the flight you want to change using the 'Create New Schedule' Button. When you hit OK it populates the days desired. You should then delete the old flight. When you think about it, this is logical. If the program had to update all the days every time you edited it a box it would slow down the program immensely. So the box method is for changing things like destination and time in ONE flight only. I do think the box for days should not be editable to stop confusion though. I hope this helps.
-
@elpix It is how I thought. To modify the days as you require you need to create a clone of the flight you want to change using the 'Create New Schedule' Button. When you hit OK it populates the days desired. You should then delete the old flight. When you think about it, this is logical. If the program had to update all the days every time you edited it a box it would slow down the program immensely. So the box method is for changing things like destination and time in ONE flight only. I do think the box for days should not be editable to stop confusion though. I hope this helps.
@killamarshian said in Flight schedules logic ?:
I do think the box for days should not be editable to stop confusion though.
Agree.