London Underground S8

7 Topics 14 Posts
  • Query

    3
    0 Votes
    3 Posts
    41 Views

    I completely understand. Thank you very much for your response. I will not disturb you anymore and I wish you a happy and healthy 2024

  • Installer Issue with Met Line Enhancement Pack

    3
    0 Votes
    3 Posts
    181 Views

    @derek Yep thanks all sorted. If anyone else gets this issue it can be resolved by downloading Microsoft WebView 2 and installing it.

  • S Stock new acceleration stats.

    1
    0 Votes
    1 Posts
    141 Views
    No one has replied
  • Moorgate WB platform

    3
    0 Votes
    3 Posts
    379 Views

    Don't assume that London Underground signalling is the same as Network Rail, there are significant differences. If the signal in question is OA260 then it's a Draw Up signal that you need to approach slowly. Be below 5 mph about 2 car lengths before it and it should clear before you reach it. It would have been helpful if the manual listed the Draw Up and Approach Controlled signals.

    Andy L

  • What does this mean?

    1
    0 Votes
    1 Posts
    478 Views
    No one has replied
  • This topic is deleted!

    1
    0 Votes
    1 Posts
    57 Views
    No one has replied
  • How do you enable weak field?

    2
    0 Votes
    2 Posts
    1k Views

    I have just purchased the S8 and would also like to know the answer to this question.